Haverhill
Filter by type
Alerts
-
Service Change UpcomingOn the weekend of March 8-9, buses will replace train service between Oak Grove & North Station on the Haverhill Line to allow for signal improvement work.- A diversion schedule will be in effect.
- Buses will provide service between Oak Grove and North Station and there will be normal train service between Oak Grove and Bradford.
- This allows for signal improvement work.
-A diversion schedule will be in effect
Here is a list of the shuttle bus locations:
North Station:
Nashua Street, at the Western side of North Station. If you are traveling to Malden Center or Oak Grove, there is also an Orange Line shuttle bus available on Haverhill Street off of Causeway.
Malden Center:
At the busway between the station and Commercial Street.
Oak Grove:
At the busway between the station and Banks Place.Updated: 2/24/2025 3:05 PM EST -
Service Change UpcomingOn the weekend of March 1-2, the Orange Line will replace normal weekend train service between Oak Grove and North Station on the Haverhill Line to allow for signal improvement work.-A diversion schedule will be in effect.
-Passengers can use the Orange Line for service between North Station and Oak Grove. There will be normal Commuter Rail weekend train service between Oak Grove and Bradford.
-There will be no shuttle buses provided for this diversion.Updated: 2/25/2025 3:01 AM EST -
DelayHaverhill Line Train 218 (5:32 pm from Bradford) is operating 25-35 minutes behind schedule between Oak Grove and North Station due to an earlier train with a mechanical issue ahead.Affected direction:
InboundUpdated: 2/25/2025 6:52 PM EST -
Station Closure OngoingCommuter Rail train service is suspended at Haverhill station through Summer 2025 to allow for work on the South Elm Street Bridge. An accessible van operates between Haverhill and Bradford.Built in 1906, the South Elm Bridge is beyond its useful life and ready to be replaced. Using accelerated bridge construction techniques to reduce customer and traffic impacts, the MBTA will replace the nearly-120-year-old bridge with a modern single-span structure with a useful life of 75 years. The new structure will include a ballasted steel deck, which means a smoother ride for passengers. The MBTA will also perform roadway, sidewalk, and drainage improvements along South Elm Street.Updated: 7/30/2024 10:08 AM EDT
-
DelayHaverhill Line Train 297 (5:55 pm from North Station) is operating 15-25 minutes behind schedule between Melrose Highlands and Bradford due to train traffic.Affected direction:
OutboundUpdated: 2/25/2025 6:39 PM EST -
DelayHaverhill Line Train 217 (5:35 pm from North Station) is operating 10-20 minutes behind schedule between Ballardvale and Bradford due to train traffic.Affected direction:
OutboundUpdated: 2/25/2025 6:35 PM EST -
DelayHaverhill Line Train 219 (6:40 pm from North Station) has departed North Station and is operating 10-20 minutes behind schedule due to train traffic and an earlier train with a mechanical issue ahead.Affected direction:
OutboundUpdated: 2/25/2025 7:05 PM EST -
DelayHaverhill Line Train 298 (6:48 pm from Reading) is operating 5-15 minutes behind schedule between Wyoming Hill and North Station due to train traffic.Affected direction:
InboundUpdated: 2/25/2025 7:13 PM EST -
Parking Issue OngoingThe Oak Grove Station Parking Lot has reduced availability through Monday, Mar 31, 2025, due to construction. Alternative parking is available at Wellington and/or Station Landing Garage (levels 6-8).
-
Escalator Closure OngoingOak Grove Escalator 105 (Commuter Rail platform to unpaid lobby) unavailable