Framingham/Worcester
Filter by type
Alerts
-
DelayWorcester Line Train 528 (4:30 pm from Worcester) is operating 20-30 minutes behind schedule between Boston Landing and South Station.Affected direction:
InboundUpdated: 3/14/2025 5:52 PM EDT -
Track ChangePlease board all inbound Worcester Line trains on the outbound platform (Track 1) at West Natick through Wellesley Farms until 8:00 pm.Affected stops:
Wellesley Farms
Wellesley Hills
Wellesley Square
Natick Center
West NatickUpdated: 3/14/2025 1:56 PM EDT -
Track ChangePlease board all inbound Framingham Line trains on the outbound platform (Track 1) at Framingham through Wellesley Farms until 8:00 pm.Affected stops:
Framingham
West Natick
Natick Center
Wellesley Square
Wellesley Hills
Wellesley FarmsUpdated: 3/14/2025 1:57 PM EDT -
Track ChangePlease board all outbound Framingham/Worcester Line trains on the inbound platform (Track 2) at Wellesley Farms through Framingham until 8:00 pm.Affected stops:
Wellesley Farms
Wellesley Hills
Wellesley Square
Natick Center
West Natick
FraminghamUpdated: 3/14/2025 2:00 PM EDT -
Track ChangePlease board Worcester Line Train 529 (5:30 pm from South Station) on the outbound platform (Track 1) at West Natick and Framingham.Affected direction:
Outbound
Affected stops:
West Natick
FraminghamUpdated: 3/14/2025 5:13 PM EDT -
Track ChangePlease board Worcester Line Train 532 (6:35 pm from Worcester) on the inbound platform (Track 2) at West Natick through Wellesley Farms.Affected direction:
Inbound
Affected stops:
West Natick
Natick Center
Wellesley Square
Wellesley Hills
Wellesley FarmsUpdated: 3/14/2025 6:27 PM EDT -
Service ChangeOn Sunday, Mar 16, the Commuter Rail will operate on a special schedule with some trains being replaced by shuttle buses to accommodate St. Patrick's Parade passengers. Check your line's alerts and schedule for more detail. MBTA.com/guides/st-patricks-day-guideAffected lines:
Worcester Line
Needham Line
Franklin Line
Fairmount Line
Providence Line
Middleborough Line
Kingston Line
Greenbush Line
To South Boston ( First trip leaves South Station @ 9:30 am)
Shuttle pick up:
Summer St @ Atlantic Ave
Shuttle drop off:
E 1st St @ City Point Bus Terminal
To South Station (Last trip leaves South Boston @ 4:30 pm)
Shuttle pick up:
E 1st St @ City Point Bus Terminal
Shuttle drop off:
Summer St @ Atlantic AveUpdated: 3/14/2025 2:55 PM EDT -
Service Change UpcomingOn Sunday, Mar 16, the Commuter Rail will operate on a regular weekend schedule. Passengers attending the St. Patrick's Day Parade should utilize bus shuttles to/from South Station along the parade route between 9:30 am & 5:00 pm. Expect heavy ridership. MBTA.com/guides/st-patricks-day-guideAffected lines:
Worcester Line
Needham Line
Franklin Line
Fairmount Line
Providence Line
Middleborough Line
Kingston Line
Greenbush Line
To South Boston ( First trip leaves South Station @ 9:30 am)
Shuttle pick up:
Summer St @ Atlantic Ave
Shuttle drop off:
E 1st St @ City Point Bus Terminal
To South Station (Last trip leaves South Boston @ 4:30 pm)
Shuttle pick up:
E 1st St @ City Point Bus Terminal
Shuttle drop off:
Summer St @ Atlantic AveUpdated: 3/14/2025 3:01 AM EDT -
Service Change UpcomingOn Sunday, March 16th, Worcester Line Train 2510 (3:10 pm from Worcester) will be replaced by a shuttle bus to accommodate large St. Patrick's Day crowds.Affected direction:
InboundUpdated: 3/13/2025 1:02 PM EDT -
Service Change UpcomingOn Sunday, March 16, Worcester Line Train 2509 (1:00 pm from South Station) will hold at South Station until 2:00 pm to accommodate large St. Patrick's Day crowds. bit.ly/3R4Rks0Affected direction:
OutboundUpdated: 3/12/2025 1:24 PM EDT -
DelayWorcester Line Train 529 (5:30 pm from South Station) is operating 15-25 minutes behind schedule between Southborough and Worcester.Affected direction:
OutboundUpdated: 3/14/2025 6:38 PM EDT -
DelayFramingham Line Train 595 (4:55 pm from South Station) is operating 10-20 minutes behind schedule between South Station and Framingham.Affected direction:
OutboundUpdated: 3/14/2025 5:11 PM EDT -
DelayWorcester Line Train 527 (4:45 pm from South Station) is operating 5-15 minutes behind schedule between West Natick and Worcester.Affected direction:
OutboundUpdated: 3/14/2025 5:31 PM EDT -
DelayFramingham Line Train 594 (5:20 pm from Framingham) is operating 5-15 minutes behind schedule between Natick Center and South Station.Affected direction:
InboundUpdated: 3/14/2025 5:41 PM EDT -
DelayFramingham Line Train 597 (5:45 pm from South Station) is operating 5-15 minutes behind schedule between Wellesley Hills and Framingham.Affected direction:
OutboundUpdated: 3/14/2025 6:32 PM EDT -
Schedule ChangeThe new Spring/Summer Schedule will go into effect on March 24th with seasonal time adjustments. The schedule for all lines are available on MBTA.com. cdn.MBTA.com/sites/default/files/media/route_pdfs/batch_7394/2025-03-24-cr-spring-summer-framingham-worcester-line.pdf
-
Service ChangeOn Sunday, March 16th, bikes/scooters will not be allowed on any Commuter Rail train or Shuttle Bus due to heavy St. Patrick’s Day Parade ridership. MBTA.com/guides/st-patricks-day-guideAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 3/14/2025 3:14 PM EDT -
Service Change UpcomingOn Sunday, March 16th, bikes/scooters will not be allowed on any Commuter Rail train or Shuttle Bus due to heavy St. Patrick’s Day Parade ridership. MBTA.com/guides/st-patricks-day-guideAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 3/14/2025 3:15 PM EDT -
Wellesley Square Station Issue OngoingThere is no accessible path connecting the inbound and outbound platforms at Wellesley Square Station. The existing path includes steep slopes and is long. Designs are underway to provide for a fully compliant pathway. MBTA.com/stops/place-WML-0147There are accessible mini-high platforms at the Western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.Updated: 3/7/2025 2:07 PM EST
-
Natick Center Station Issue OngoingEffective until further notice, the entrances to Natick Center station are relocated to Washington Street for access to the inbound and outbound platforms. MBTA.com/natickcenterNorth Avenue entrance and Walnut Street entrance will remain closed until further notice.
This access change will allow for work on the new platforms as part of Natick Center Station Accessibility Improvements Project.Updated: 2/3/2025 11:17 AM EST -
South Station Bike Issue OngoingSouth Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. MBTA.com/projects/south-station-transportation-center-improvements
-
Worcester Parking Issue OngoingThe Upper Parking Lot at Worcester Station is closed with the exception to accessible parking, due to construction. MBTA.com/UnionStation